New-build Z-99 Aravis
01-03-2022

New-build Z-99 Aravis

After a successful sea trial at the end of February, we were able to deliver the Z-99 Aravis to Rederij Nele at the beginning of March 2022. We thank the company for the great cooperation and wish the crew a lot of success and fair winds.

New-build Z-99 Aravis New-build Z-99 Aravis New-build Z-99 Aravis New-build Z-99 Aravis New-build Z-99 Aravis New-build Z-99 Aravis